Construction cost plan
Elemental budgets, design assumptions, cost drivers, risk items and option comparisons for feasibility or design development.
Inspect a real anonymised client quotation, detailed Bill of Quantities and editable rate build-ups prepared through our working process.

This complete 20-page PDF shows a customer-facing quotation, pricing summary, tender qualifications and detailed Bill of Quantities.
It is a genuine Estimate Exact document supplied for publication with the client and site details already anonymised. The measured descriptions, pricing structure and commercial qualifications are retained.
Download example client quote (PDF)The Excel workbook contains two editable tabs: the Bill of Quantities and the linked Rate Build-Ups used to form each item rate.
This is a genuine working workbook, showing measured descriptions, quantities, labour productivity, materials, plant, specialist inputs and commercial uplifts.
Download BoQ and rate build-ups (Excel)

The exact files are agreed before work starts. Depending on the brief and information available, other commissioned outputs can include:
Elemental budgets, design assumptions, cost drivers, risk items and option comparisons for feasibility or design development.
Purchasing quantities, units, waste assumptions, product notes and procurement information linked to the measured work.
Pricing schedules, work-package comparisons, qualifications, scope reconciliation and supporting reports where agreed.
Measured quantities, labour outputs, package interfaces, exclusions and rates for only the subcontract scope being tendered.
Send the scope and drawings; we will agree the service, deliverables and fixed fee.