Incomplete allowances
Kitchens, bathrooms, services, external works, utility connections and site constraints are easy to understate early.
Understand the likely construction budget, test important design choices and move toward a measured tender with the assumptions made clear.
A self-build budget needs to cover much more than the visible structure. We consider the project information available, separate defined quantities from design-stage allowances and show where choices or missing information can move the likely construction cost.
Kitchens, bathrooms, services, external works, utility connections and site constraints are easy to understate early.
Glazing, roof geometry, structural spans, heating choices and finish levels can materially affect the build.
Contractors may price different assumptions unless the scope and tender information are made consistent.
Planning drawings can establish the shape of the project, but structure, services, finishes and external works still affect the total. We separate defined information from allowances so the budget has a visible basis.
Roof form, glazing, wall build-up, heating systems and finish levels can materially change the plan. Option comparisons help you focus design effort where it matters.
As technical drawings and specifications develop, the early cost plan can be refined into measured quantities, a BoQ or a detailed estimate for contractor pricing.
Establish an elemental feasibility budget from planning information and the intended specification.
Update the plan as structure, services, schedules and finishes become better defined.
Prepare measured information or a BoQ to give tendering contractors a clearer and more comparable scope.
Not every project will have a complete tender pack. Send the current documents and explain the decision, deadline and output you need. We will identify any material gaps before confirming the commission.
No. A cost plan is an independent structured budget based on the information and assumptions available. Contractor quotations follow once a tender-ready scope is issued.
Option comparisons can identify major cost drivers and test alternative specifications, subject to the design information provided.
A measured BoQ or tender schedule can be prepared as the design develops so builders price a more consistent scope.
Send the drawings and tell us what decisions you are facing. We will recommend the appropriate cost-plan or tender stage.