Site clearance and earthworks
Strip, reduced levels, excavation classes, stockpiling, imported fill, compaction and muck-away quantities are separated where the data supports them.
Price the ground conditions, quantities, disposal, plant and interfaces that determine whether a groundworks package performs commercially.
Groundworks pricing depends on more than plan area. We measure excavation and fill movements, disposal, concrete, reinforcement, drainage, service routes, paving and external works against the available structural and civil information, with ground-risk assumptions clearly stated.
Strip, reduced levels, excavation classes, stockpiling, imported fill, compaction and muck-away quantities are separated where the data supports them.
Trenches, pads, ground beams, concrete, reinforcement, substructure masonry and floor preparation follow the structural design.
Foul, surface and attenuation systems are measured by diameter, depth, bedding, fittings, chambers and connections where defined.
Plot connections, incoming service trenches, ducts, draw pits and reinstatement require clear provider and main-contractor boundaries.
Sub-bases, kerbs, edgings, permeable paving, slabs, roads, parking and landscaping preparation are itemised to the specification.
Excavators, dumpers, compaction, pumps, trench support, road plates, access and testing are considered on the agreed method and programme.
Unconfirmed soil, contamination, rock, water and bearing conditions should not be disguised as fixed quantities.
Haul distance, waste classification, tipping charges and bulking can materially alter excavation cost.
Adoption, statutory charges, off-site work and connection approvals need a defined responsibility.
Send the latest information available and explain whether the purpose is feasibility, a contractor quotation, a subcontract bid, procurement or a formal tender. We will identify material gaps before confirming the work.
The output depends on the service commissioned and the maturity of the design.
Yes. We isolate the agreed package and record interfaces with the structure, utilities, landscaping and main contractor.
We can derive an allowance from measured excavation, bulking and reuse assumptions, but vehicle capacity, material classification and site conditions must be confirmed.
Only where agreed and supported by an assumed method or specialist quotation. Design responsibility should be stated.
Send the civil, structural and ground information with your package boundary and tender deadline.