Strip-out and temporary work
Existing insulation, ceilings, roof coverings or structure may require selective removal, protection and temporary weathering.
Measure the steel, roof alterations, dormers, insulation, stairs and making good that determine the real cost—not just the new floor area.
Loft conversions concentrate structural, access, fire and weathering work into a small footprint. We review the existing roof, proposed structure, dormer details, stairs, insulation, openings and services together so the estimate reflects the construction sequence and agreed finish.
Existing insulation, ceilings, roof coverings or structure may require selective removal, protection and temporary weathering.
Steel beams, trimmers, new joists, bearings, connections, trimming around stairs and builder's work are separated from the general carpentry.
Dormer structure, cheeks, coverings, flat roofs, rooflights, flashings, tiles and rainwater goods are measured to the proposed form.
Insulation zones, vapour control, plasterboard layers, fire protection, escape requirements and associated doors are priced to the stated design.
Staircase, balustrades, partitions, doors, skirtings, plastering, decoration and floor finishes follow the agreed supply basis.
Electrical points, heating changes, bathroom work, alarms and making good to lower floors are included where defined.
Hidden structure and actual site dimensions may change the work after opening up.
Access, temporary covering and lifting requirements vary with property geometry and location.
Doors, alarms, linings and protected routes need a coordinated design and clear responsibility.
Send the latest information available and explain whether the purpose is feasibility, a contractor quotation, a subcontract bid, procurement or a formal tender. We will identify material gaps before confirming the work.
The output depends on the service commissioned and the maturity of the design.
An early allowance can be prepared, but steel sizes, bearings, floor build-up and trimming should be updated when the engineer's design is issued.
It can be included on an agreed allowance or quotation basis. The required access and temporary weather protection should be defined.
Yes. The estimate can be limited to a clearly defined stage or trade boundary.
Upload the loft drawings, structural information and required finish stage for a fixed-fee proposal.