Electrical distribution
Incoming supply, boards, submains, containment, cabling, earthing and protective devices are itemised to the available design.
Price services by system, point, equipment and connection responsibility instead of hiding the package in a broad allowance.
Services pricing needs the drawings, schedules, specifications and equipment responsibilities to agree. We organise the package by system and installation stage, distinguish client or specialist equipment from installation work and identify testing, commissioning and builder's-work interfaces.
Incoming supply, boards, submains, containment, cabling, earthing and protective devices are itemised to the available design.
Luminaires, emergency lighting, controls, sockets, spurs, specialist outlets and final fittings follow schedules and supply boundaries.
Detection, alarms, data, access control, CCTV and other specialist systems are separated by design and subcontract responsibility.
Cold and hot water, sanitary connections, above-ground drainage, equipment and insulation are measured by system and point.
Heat sources, distribution, emitters, ventilation, controls, flues and commissioning are priced to the selected system.
Builders' work, supports, fire stopping, metering, certification, balancing, commissioning and handover duties are allocated explicitly.
Layouts may show points without containment routes, distribution sizes, controls or equipment schedules.
Final fittings, sanitaryware, controls and specialist equipment may be client-supplied, free-issued or included by the installer.
Certification, commissioning, fire stopping, access panels and coordinated builder's work can be missed between packages.
Send the latest information available and explain whether the purpose is feasibility, a contractor quotation, a subcontract bid, procurement or a formal tender. We will identify material gaps before confirming the work.
The output depends on the service commissioned and the maturity of the design.
Yes. Mechanical and electrical packages can be commissioned separately and limited to the defined systems.
Only on the stated supply basis. Client-supplied or free-issued items can be separated from installation labour.
We can prepare a budget with explicit allowances and design gaps, but it should not be presented as a fully measured tender until the systems are defined.
Send the services drawings, schedules and package responsibilities with the tender deadline.