NEW-BUILD HOMES

New-build house estimates from substructure to handover

Build a controlled price for the whole home, including the work between the major elements that broad square-metre rates often overlook.

BEST FORBuilders, developers and self-builders
TYPICAL OUTPUTWhole-house estimate or cost plan
FEE BASISFixed fee agreed from the pack
THE PRICING CHALLENGE

Measure the work the project actually contains.

A new home can be cost-planned early and progressively measured as the design develops. We organise the project from site preparation and foundations through the envelope, internal work, services and external areas, with the status of design information and allowances made visible.

WHAT WE REVIEW AND MEASURE

The detail behind this type of project.

Site and substructure

Site clearance, reduced levels, foundations, below-ground drainage, substructure, floors and service entries are measured to the available civil and structural information.

Frame and external walls

Masonry, timber or steel structure, insulation, cavity components, lintels, DPCs and associated interfaces are separated where defined.

Roof and weathering

Structure, insulation, coverings, flashings, rooflights, gutters and penetrations are considered rather than relying on one gross roof rate.

Openings and internal work

Windows, external doors, internal doors, stairs, partitions, plastering, carpentry and finishes follow the relevant schedules and supply responsibilities.

Mechanical and electrical

Heating, plumbing, sanitary connections, ventilation, electrical points and specialist systems are priced at the level supported by the design.

External works and completion

Driveways, paths, patios, walls, fencing, drainage, landscaping and utility connections are included only to the agreed drawings and boundary.

COMMERCIAL WATCHPOINTS

Where scope and cost can move.

Specification depth

Two houses with the same floor area can carry very different structure, glazing, services and finish costs.

External works

Plot drainage, retaining, access, utility connections and landscaping can sit outside architectural plans but materially affect the total.

Design development

Early allowances should be updated as structural, MEP and finish information becomes coordinated.

INFORMATION TO SEND

Give the estimate a defined starting point.

Send the latest information available and explain whether the purpose is feasibility, a contractor quotation, a subcontract bid, procurement or a formal tender. We will identify material gaps before confirming the work.

  • Architectural, structural and civil drawings
  • Room, window, door and finish schedules
  • MEP information and intended specification
  • Site constraints, programme and procurement route
AGREED OUTPUTS

Documents matched to the decision.

The output depends on the service commissioned and the maturity of the design.

  • Elemental cost plan or detailed priced estimate
  • Measured BoQ by work section
  • Bill of Materials or procurement schedule where agreed
  • Design assumptions, risk items and scope qualifications
PRACTICAL ANSWERS

Questions before you send the documents.

Can you price a self-build home?

Yes. We can start with a design-stage cost plan and develop the pricing as technical information becomes available.

Can you separate each plot on a small development?

Yes, where the drawings identify plot types, shared infrastructure and plot-specific differences clearly.

Do you include utility connections?

They are included only where agreed. Statutory charges, network quotations and off-site reinforcement may need separate client allowances.

YOUR NEXT PROJECT

Need this type of project priced?

Share the new-build information and tell us whether you need feasibility, tender pricing or a measured BoQ.

Send your project information