REFURBISHMENT & CONVERSIONS

Refurbishment, HMO and conversion estimating

Separate retained fabric, removals, new work and compliance upgrades so the tender reflects the actual transformation of the building.

BEST FORContractors, developers and conversion specialists
TYPICAL OUTPUTRefurbishment or conversion tender
FEE BASISFixed fee agreed from the pack
THE PRICING CHALLENGE

Measure the work the project actually contains.

Existing buildings rarely present a clean new-build scope. We organise the tender around surveys, demolition, retained elements, structural changes, repairs, new layouts, services and statutory upgrades, while recording the uncertainties that cannot be confirmed from drawings alone.

WHAT WE REVIEW AND MEASURE

The detail behind this type of project.

Surveys, protection and strip-out

Retained features, occupied areas, hazardous-material information, temporary protection and phased demolition need a clear boundary.

Repairs and existing fabric

Masonry, timber, roofing, windows, damp treatment and local making good are measured separately from new construction.

Structural and layout changes

Openings, steelwork, new floors, stairs, partitions and builder's work are reconciled with the existing survey and proposed design.

Fire and acoustic upgrades

Compartmentation, protected routes, doorsets, ceilings, service penetrations and acoustic build-ups are priced to the information issued.

MEP replacement and adaptation

Existing services retained, removed or extended are distinguished from new installations and statutory connections.

Finishes and phased completion

Room-by-room or floor-by-floor schedules can separate preparation, repairs, finishes, fittings and client-supplied items.

COMMERCIAL WATCHPOINTS

Where scope and cost can move.

Unknown existing conditions

Opening up may reveal defective structure, hidden services or construction that differs from the survey.

Scope overlap

Demolition, builder's work, fire stopping and making good can fall between trade packages if responsibilities are not reconciled.

Occupied or phased work

Access restrictions, temporary services, protection, cleaning and out-of-hours requirements affect productivity and preliminaries.

INFORMATION TO SEND

Give the estimate a defined starting point.

Send the latest information available and explain whether the purpose is feasibility, a contractor quotation, a subcontract bid, procurement or a formal tender. We will identify material gaps before confirming the work.

  • Measured survey and proposed drawings
  • Condition reports, schedules and scope of works
  • Fire, acoustic, structural and MEP information
  • Phasing, occupancy and access constraints
AGREED OUTPUTS

Documents matched to the decision.

The output depends on the service commissioned and the maturity of the design.

  • Measured refurbishment or conversion BoQ
  • Priced estimate split by work section, area or phase
  • Existing-condition assumptions and risk register
  • Tender qualifications and specialist allowances
PRACTICAL ANSWERS

Questions before you send the documents.

Can you price from a schedule of works?

Yes. We can price the supplied schedule and reconcile it against the drawings, then flag apparent gaps and unclear responsibilities.

How do you allow for hidden defects?

Known repairs can be measured; unknown conditions should be identified as risk, provisional allowance or exclusion rather than presented as a firm quantity.

Can the estimate be split by room or floor?

Yes, where that structure supports phasing, procurement or the client's return requirements.

YOUR NEXT PROJECT

Need this type of project priced?

Send the survey, proposed design and scope documents. We will define the measurable work and treatment of existing-condition risk.

Send your project information