Surveys, protection and strip-out
Retained features, occupied areas, hazardous-material information, temporary protection and phased demolition need a clear boundary.
Separate retained fabric, removals, new work and compliance upgrades so the tender reflects the actual transformation of the building.
Existing buildings rarely present a clean new-build scope. We organise the tender around surveys, demolition, retained elements, structural changes, repairs, new layouts, services and statutory upgrades, while recording the uncertainties that cannot be confirmed from drawings alone.
Retained features, occupied areas, hazardous-material information, temporary protection and phased demolition need a clear boundary.
Masonry, timber, roofing, windows, damp treatment and local making good are measured separately from new construction.
Openings, steelwork, new floors, stairs, partitions and builder's work are reconciled with the existing survey and proposed design.
Compartmentation, protected routes, doorsets, ceilings, service penetrations and acoustic build-ups are priced to the information issued.
Existing services retained, removed or extended are distinguished from new installations and statutory connections.
Room-by-room or floor-by-floor schedules can separate preparation, repairs, finishes, fittings and client-supplied items.
Opening up may reveal defective structure, hidden services or construction that differs from the survey.
Demolition, builder's work, fire stopping and making good can fall between trade packages if responsibilities are not reconciled.
Access restrictions, temporary services, protection, cleaning and out-of-hours requirements affect productivity and preliminaries.
Send the latest information available and explain whether the purpose is feasibility, a contractor quotation, a subcontract bid, procurement or a formal tender. We will identify material gaps before confirming the work.
The output depends on the service commissioned and the maturity of the design.
Yes. We can price the supplied schedule and reconcile it against the drawings, then flag apparent gaps and unclear responsibilities.
Known repairs can be measured; unknown conditions should be identified as risk, provisional allowance or exclusion rather than presented as a firm quantity.
Yes, where that structure supports phasing, procurement or the client's return requirements.
Send the survey, proposed design and scope documents. We will define the measurable work and treatment of existing-condition risk.