What a BoQ does
A Bill of Quantities lists defined work in measurable items, with units and quantities. An unpriced BoQ gives tenderers a consistent schedule; a priced BoQ adds rates and extensions. It is useful for tender comparison, procurement and checking the effect of scope changes.
What should be measured
Work may be split into excavation, concrete, masonry, DPC, structural steel, roof layers, openings, finishes, services and external works. Descriptions should identify the construction and measurement basis, not hide a detailed assembly in a single square-metre rate.
Read the qualifications
The BoQ must be read alongside drawings, specifications, preambles, assumptions and exclusions. Unknown ground conditions, client-selected finishes or missing MEP design may require a stated provisional allowance or query.
NRM2 and practical tendering
NRM2 provides measurement rules for building works. The right level of detail depends on the information and intended use. A BoQ is a structured measurement document, not a substitute for a coordinated design or a fully agreed contract scope.