Pricing the headline area
Square-metre benchmarks are useful for early reasonableness checks, but they do not capture individual openings, junctions, changes in build-up, temporary work or a difficult site. The remedy is to measure the work at the level needed for the tender and use the benchmark only to challenge the result. If the design is too early for detailed measurement, issue a cost plan with stated allowances instead of pretending the rate is a tender price.
Reading drawings separately
Plans, sections, schedules, structural details and specifications often describe different parts of the same assembly. Pricing each document in isolation can duplicate quantities or miss components. Create registers for openings, steel, wall types and key finishes, then reconcile revisions and conflicts. When the information does not agree, raise the question or state the adopted interpretation.
Using untested labour outputs
Historic rates can conceal a different crew, access arrangement, wage cost or project type. Build key rates from hours and test the resulting total against an eight-hour working day, crew size and programme. Allow for handling, setting out and interfaces where they genuinely affect output, but avoid duplicating supervision or preliminaries already included elsewhere.
Copying quotations without a scope check
A low subcontract quotation may omit design, delivery, lifting, access, testing, temporary works or making good. Compare every significant return to the enquiry and measured requirement. Record what is included, what the main contractor must provide and how long the quotation remains valid. Never assume that a quotation title such as steelwork or MEP means the entire package is covered.
Leaving the commercial review too late
Preliminaries, waste, plant, overheads, profit, inflation basis and risk should not be rushed into the tender minutes before submission. Review major cost drivers, unusual assumptions, provisional items and client-supplied goods in time to correct them. The final quotation should distinguish supply and install, install only and exclusions so the margin is not lost through an unclear promise.