Why there is no single fee
An extension with coordinated building regulations drawings is different from a multi-unit tender with multiple revisions and specialist packages. Fees reflect what must be measured, priced and checked, the quality of the information and the documents requested. A fee for a quantity-only take-off is not directly comparable with a fully priced tender and client quotation.
What changes the amount of work
More drawing sheets do not always mean more work, but conflicting revisions, incomplete schedules, complicated ground conditions and services design can. Define whether you need an unpriced BoQ, a priced estimate, trade build-ups or a material schedule before comparing proposals.
How to get a useful fixed fee
Send the current drawings, specification, scope, deadline and your preferred pricing basis. Tell the estimator what your client supplies and which trades you will subcontract. The proposal should name the deliverables and treatment of gaps, changes and provisional items.
Compare value, not just the fee
Ask whether quantities are traceable, labour and materials separated where needed, assumptions recorded, and the spreadsheet editable. A cheaper headline can create more work for your team if it is too broad to submit or procure against.