The answer depends on the decision
A feasibility budget can be prepared from a project brief and early plans, but it must use visible assumptions. A detailed tender needs coordinated information that defines dimensions, construction, performance and scope. Calling both documents an estimate does not make them equally precise. Tell the estimator whether the output is for viability, a homeowner quotation, subcontract bid, procurement or a formal main-contract tender.
Architectural information
Plans, elevations, sections and construction details establish geometry, existing and proposed work, floor and roof build-ups, wall types, openings and finishes. Door, window, ironmongery, room-finish and sanitaryware schedules can carry quantities and specifications not shown clearly on plans. For refurbishment, demolition drawings and surveys are essential for separating retained fabric, removal, protection and making good.
Structural and civil information
Foundation layouts, reinforcement details, steel schedules, connection information, slab design and structural notes define major cost items. Civil drawings should show levels, drainage, attenuation, service routes, paving and external works. Ground-investigation, topographical and utility information may change excavation, disposal, temporary support and connection allowances. Where these are missing, the estimate must identify the assumed basis.
MEP design and specification
Electrical layouts, schematics, distribution schedules and equipment information help separate containment, wiring, fittings, controls, testing and incoming supplies. Plumbing, heating, ventilation and drainage information should identify plant, emitters, pipework, terminals and performance requirements. A single note saying services are required is not enough for a detailed package price; a cost-plan allowance may be more appropriate until the design develops.
Send revisions and commercial documents
Include the specification, planning or building-control conditions, employer requirements, scope of works, client BoQ, programme and tender amendments. State which revision is current and highlight late changes. Also explain your delivery model: labour rates, preferred suppliers, subcontract packages, client-supplied items and required markup. Good estimating begins with a controlled document set and an agreed boundary, not merely a folder of drawings.