CONTRACTOR GUIDE

How to prepare a construction tender that protects your margin

Practical guidance for UK contractors, developers and project teams.

IN THIS GUIDEStart with the return requirements · Build a scope matrix · Measure and price on a traceable basis

General commercial guidance only. Apply the project documents, contract terms and current market information to every live tender.

Start with the return requirements

Before measuring, confirm the submission date, pricing document, programme obligations, tender queries, validity period and form of return. Establish the latest drawing and specification revisions and record addenda. A technically good price can still fail if it is returned in the wrong structure or misses a mandatory schedule. Create a tender checklist and assign responsibility for measurement, supplier enquiries, specialist packages, preliminaries and final review.

Build a scope matrix

Set out what is included, retained, excluded, supplied by the client or designed by others. Reconcile architectural, structural, civil and MEP information rather than pricing each drawing in isolation. Package boundaries need particular attention: who provides openings, builders work, fire stopping, testing, access, lifting and making good? A short written scope matrix exposes overlaps and omissions before they become commercial disputes.

Measure and price on a traceable basis

Use quantities that can be followed back to drawings and schedules. Build important rates from labour output, material consumption, plant and subcontract inputs instead of relying only on historic averages. Compare supplier and subcontract quotations with the measured requirement and note exclusions. Price project-specific preliminaries against the programme and logistics, then apply overhead and profit using the company basis.

Challenge the cost drivers

Review the ten or fifteen items that carry most of the tender value or risk. Remeasure significant quantities, test labour hours against crew duration and inspect large material or specialist allowances. Check temporary works, scaffolding, cranage, disposal, testing, permits and attendances. Compare the final cost per square metre or trade benchmark only as a reasonableness check; it should not replace the detailed review.

Qualify the submission clearly

The tender letter should identify the drawings and documents priced, programme assumptions, inclusions, exclusions, provisional allowances, client-supplied items and the basis of specialist quotations. Avoid qualifications so broad that they undermine the offer, but do not hide genuine uncertainty. A clear tender gives the client something understandable and gives the contractor a defensible record of the price submitted.