CONTRACTOR GUIDE

How to price a building job without missing important costs

Practical guidance for UK contractors, developers and project teams.

IN THIS GUIDEDefine the boundary first · Measure individual work items · Build and test rates

General commercial guidance only. Apply the project documents, contract terms and current market information to every live tender.

Define the boundary first

Confirm whether demolition, drainage, external works, decoration, client-supplied goods and final fix are included. Note revisions and read the specification alongside the drawings. A contractor can price a precise quantity perfectly and still lose money by omitting a trade interface.

Measure individual work items

Build from excavation and substructure through structure, envelope, openings, finishes and services. Check schedules against plans and structural information. Count lintels and openings by type, and measure roof flashings and insulation as well as roof area.

Build and test rates

Separate direct trade hours from material quantities and purchasing waste. Add plant, access, subcontract packages, modest but adequate preliminaries, overhead and profit on the chosen basis. Check output assumptions against a practical working day and available crew.

Review before issue

Reconcile the total to the scope, check major quantities and top cost drivers, and list PC sums, provisional items, exclusions and qualifications. A clear client quotation should tell the customer what is supplied and installed, installed only, or omitted.