Define the boundary first
Confirm whether demolition, drainage, external works, decoration, client-supplied goods and final fix are included. Note revisions and read the specification alongside the drawings. A contractor can price a precise quantity perfectly and still lose money by omitting a trade interface.
Measure individual work items
Build from excavation and substructure through structure, envelope, openings, finishes and services. Check schedules against plans and structural information. Count lintels and openings by type, and measure roof flashings and insulation as well as roof area.
Build and test rates
Separate direct trade hours from material quantities and purchasing waste. Add plant, access, subcontract packages, modest but adequate preliminaries, overhead and profit on the chosen basis. Check output assumptions against a practical working day and available crew.
Review before issue
Reconcile the total to the scope, check major quantities and top cost drivers, and list PC sums, provisional items, exclusions and qualifications. A clear client quotation should tell the customer what is supplied and installed, installed only, or omitted.