ROOFING & CLADDING

Roofing and cladding package estimating

Move beyond a single roof or façade area with the edges, openings, flashings, penetrations, support systems and access separately considered.

BEST FORRoofing, cladding and envelope contractors
TYPICAL OUTPUTEnvelope package estimate
FEE BASISFixed fee agreed from the pack
THE PRICING CHALLENGE

Measure the work the project actually contains.

Envelope packages carry many linear, counted and interface items around the headline area. We reconcile elevations, roof plans, details, schedules and specifications to measure the defined system and distinguish the specialist contractor's supply, fabrication and installation obligations.

WHAT WE REVIEW AND MEASURE

The detail behind this type of project.

Primary coverings and panels

Roof zones, façade panels, membranes, insulation and liner systems are separated by type, thickness, orientation and location.

Edges and interfaces

Ridges, hips, valleys, verges, eaves, parapets, corners, cills, jambs and abutments are measured as linear details.

Openings and penetrations

Rooflights, smoke vents, doors, louvres, service penetrations and trimming details are counted and reconciled with schedules.

Flashings, trims and gutters

Fabricated flashings, closures, gutters, outlets, downpipes and transition pieces are itemised where defined.

Support, fixings and accessories

Rails, brackets, fasteners, tapes, sealants, barriers, mesh and secondary support are included to the agreed design responsibility.

Access, lifting and testing

Scaffold, MEWPs, cranes, unloading, temporary protection, testing and warranties are treated on the stated project basis.

COMMERCIAL WATCHPOINTS

Where scope and cost can move.

Support-system boundary

The main frame, secondary steel, rails and brackets may be split between designer, supplier and installer.

Detail density

Corners, openings, penetrations and transitions can drive labour and fabrication beyond the net area rate.

Access and sequencing

Building height, programme, craneage, storage and follow-on trades affect output and preliminaries.

INFORMATION TO SEND

Give the estimate a defined starting point.

Send the latest information available and explain whether the purpose is feasibility, a contractor quotation, a subcontract bid, procurement or a formal tender. We will identify material gaps before confirming the work.

  • Roof plans, elevations and construction details
  • Cladding, roofing and insulation specification
  • Opening, rooflight and penetration schedules
  • Access, lifting and support-system responsibilities
AGREED OUTPUTS

Documents matched to the decision.

The output depends on the service commissioned and the maturity of the design.

  • Roofing or cladding package BoQ
  • Panel, covering, flashing and trim quantities
  • Labour, material, plant and fabrication build-ups
  • Package qualifications and interface schedule
PRACTICAL ANSWERS

Questions before you send the documents.

Can you price cladding without the roof?

Yes. The commission can cover one defined envelope package, system, elevation or phase.

Do you measure flashings and trims separately?

Yes, where the drawings and specification define them. Complex fabricated details may require supplier input or stated assumptions.

Can you include access equipment?

Yes, on an agreed method and programme basis. Specialist scaffold or crane quotations may remain provisional until confirmed.