STRUCTURAL STEEL

Structural steel fabrication and installation estimating

Build the package around supply, fabrication, delivery and erection—not tonnage alone—and state every interface that affects the tender.

BEST FORSteel fabricators and main contractors
TYPICAL OUTPUTSteel package estimate
FEE BASISFixed fee agreed from the pack
THE PRICING CHALLENGE

Measure the work the project actually contains.

Steelwork tenders require the member schedule to be reconciled with plans, details, connections and the site installation method. We identify the agreed design boundary and build the price around material, shop work, coatings, delivery, lifting and erection responsibilities.

WHAT WE REVIEW AND MEASURE

The detail behind this type of project.

Member register and tonnage

Beams, columns, plates and hollow sections are scheduled by size, length and quantity from the information supplied.

Connections and fabrication

Plates, cleats, stiffeners, holes, welding, cutting, drilling and assembly need an agreed connection and fabrication basis.

Design and drawings

Connection design, temporary stability, surveys, calculations and shop drawings are included only where the package requires them.

Protection and finishes

Primer, galvanizing, intumescent or other coatings are separated by specification, preparation and application responsibility.

Delivery and erection

Loads, transport, craneage, MEWPs, operatives, bolts, site welding and sequencing follow the assumed installation plan.

Builder's work and interfaces

Padstones, pockets, bearings, grouting, fire stopping, making good and temporary works are allocated explicitly between trades.

COMMERCIAL WATCHPOINTS

Where scope and cost can move.

Connection information

Member tonnage can be known while connection plates, welds, bolts and fabrication hours remain undefined.

Existing structure

Reuse, alteration and connection to existing steel require survey information and a clear design responsibility.

Erection constraints

Crane position, lifting radius, access, temporary stability and phased installation can dominate site cost.

INFORMATION TO SEND

Give the estimate a defined starting point.

Send the latest information available and explain whether the purpose is feasibility, a contractor quotation, a subcontract bid, procurement or a formal tender. We will identify material gaps before confirming the work.

  • Structural plans, details and member schedule
  • Connection-design and fabrication responsibility
  • Coating and fire-protection specification
  • Delivery, lifting and erection constraints
AGREED OUTPUTS

Documents matched to the decision.

The output depends on the service commissioned and the maturity of the design.

  • Member and steelwork quantity register
  • Supply, fabrication and installation build-ups
  • Plant, coating and specialist allowances
  • Design responsibilities, exclusions and qualifications
PRACTICAL ANSWERS

Questions before you send the documents.

Can you calculate steel tonnage?

Yes, from a sufficiently defined member schedule and drawings. Plates, connections and wastage require an agreed basis.

Can you price labour-only erection?

Yes. The lifting plan, plant, bolts, temporary stability and work by others must be clearly defined.

Do you include shop drawings?

Only when commissioned and within the contractor's responsibility. The estimate can include an allowance, but it is not a structural design service.

YOUR NEXT PROJECT

Need this type of project priced?

Send the structural set, steel schedule and exact supply, fabrication and erection responsibilities.

Send your project information